|
Tri Star
Engineering provides Technical Expertise for various DOD systems
to include Installation Support, Ship Check Functions, and
review of FTC/STC design studies. Tri Star assists in the
close out of Production issues. Reconciles DD250s with the
corresponding invoices for preparation of final billing. Review
and digitize Contract CDRLs. Prepare logistics Documents for
emerging web site. Review and digitize conference minutes.
Review program review minutes.
Tri Star
Engineering has provided expertise in ship scheduling, attended
fleet scheduling conferences, drafted visit messages, and
assisted in the RMMCO processes as it relates to Installation
Support.
Tri Star
has assembled and disassembled AN/SPS-49 radar pedestals.
Pedestal disassembly included: Properly identifying all assemblies,
subassemblies, wiring harnesses, fasteners, and miscellaneous
hardware. Tri Star Engineering has also refurbished AN/SPS-48
Wave Guides.

|